Taleem Ul Haq

PWSID: IL3161752

No active violations
This system has no unresolved violations. The most recent violation on record was 2025-04-05.

This system has more violations on record than 99% of water systems in Illinois.

Violation trend: 111.2 per year over the last 5 years, similar to 100.6 per year in the previous 5.

System Details

Population Served100
Service Connections1
Water SourceGroundwater
System TypeNon-Transient Non-Community
OwnerPrivate
StatusActive
CityPlainfield
EPA ZIP on File60544

Lead & Copper Testing

ContaminantLevelEPA Action LevelStatus
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level

Violation History (1059 total)

ContaminantViolationDateHealth-BasedStatus
7500Other2025-04-05Returned to Compliance
5200RPT2024-10-17Returned to Compliance
5200TT2024-10-17YesReturned to Compliance
2378MR2024-01-01 MajorAcknowledged
2378MR2024-01-01 MajorAcknowledged
2380MR2024-01-01 MajorAcknowledged
2380MR2024-01-01 MajorAcknowledged
2955MR2024-01-01 MajorAcknowledged
2955MR2024-01-01 MajorAcknowledged
2964MR2024-01-01 MajorAcknowledged
2964MR2024-01-01 MajorAcknowledged
2968MR2024-01-01 MajorAcknowledged
2968MR2024-01-01 MajorAcknowledged
2969MR2024-01-01 MajorAcknowledged
2969MR2024-01-01 MajorAcknowledged
2976MR2024-01-01 MajorAcknowledged
2976MR2024-01-01 MajorAcknowledged
2977MR2024-01-01 MajorAcknowledged
2977MR2024-01-01 MajorAcknowledged
2979MR2024-01-01 MajorAcknowledged
2979MR2024-01-01 MajorAcknowledged
2980MR2024-01-01 MajorAcknowledged
2980MR2024-01-01 MajorAcknowledged
2981MR2024-01-01 MajorAcknowledged
2981MR2024-01-01 MajorAcknowledged
2982MR2024-01-01 MajorAcknowledged
2982MR2024-01-01 MajorAcknowledged
2983MR2024-01-01 MajorAcknowledged
2983MR2024-01-01 MajorAcknowledged
2984MR2024-01-01 MajorAcknowledged
2984MR2024-01-01 MajorAcknowledged
2985MR2024-01-01 MajorAcknowledged
2985MR2024-01-01 MajorAcknowledged
2987MR2024-01-01 MajorAcknowledged
2987MR2024-01-01 MajorAcknowledged
2989MR2024-01-01 MajorAcknowledged
2989MR2024-01-01 MajorAcknowledged
2990MR2024-01-01 MajorAcknowledged
2990MR2024-01-01 MajorAcknowledged
2991MR2024-01-01 MajorAcknowledged
2991MR2024-01-01 MajorAcknowledged
2992MR2024-01-01 MajorAcknowledged
2992MR2024-01-01 MajorAcknowledged
2996MR2024-01-01 MajorAcknowledged
2996MR2024-01-01 MajorAcknowledged
7500Other2023-07-22Returned to Compliance
7500Other2023-07-22Returned to Compliance
7500Other2023-07-22Returned to Compliance
7500Other2023-07-22Returned to Compliance
7500Other2023-04-26Returned to Compliance

Showing 50 of 1059 historical violations.

Understanding This Water System's Record

Taleem Ul Haq is a non-transient non-community water system that draws from groundwater sources and serves a population of 100 in Plainfield, Illinois. This page shows its complete compliance history as reported to the EPA's Safe Drinking Water Information System (SDWIS), the federal database that tracks every public water system in the United States.

What Do These Violations Mean?

Health-based violations mean the system exceeded an EPA maximum contaminant level (MCL) or failed to provide required treatment. These indicate potential health risks from contaminants like lead, arsenic, bacteria, nitrates, or disinfection byproducts. Non-health-based violations involve monitoring, reporting, or procedural requirements — the system missed a testing deadline or failed to notify customers, but contaminant levels were not necessarily unsafe.

What Should You Do?

Your water utility is required to publish an annual Consumer Confidence Report (CCR) that details test results and any violations. If your system has active health-based violations, consider a certified water filter rated for the specific contaminants involved. The contaminant guides on this site explain health risks and filter options for common pollutants. For the most current results, contact your water utility directly — EPA data can lag weeks or months behind real-time testing.