Transient Non-Community · PWSID UTAH27052

Zion Np - East Gate System

Serves 27 peopleGroundwaterOwner: FederalHurricane, Utah
Nothing open right now.

On record since 2017: 14 violations. 13 missed or late tests · 1 notice or report. Most recent began 2025-01-01.

None of them is a measurement of contaminated water.

For this year's test results, ask the utility for its annual Consumer Confidence Report. Every community system must publish one.

0Over the limit
0Treatment lapse
13Missed or late test
1Notice or report

More violations on record than 67% of active water systems in Utah. Small systems with no staff chemist often rack up missed-test violations; big utilities rarely do.

The record, year by year

2005201020152017 · Missed or late test: 32017 · Missed or late test: 32017 · Missed or late test: 32017 · Notice or report: 12019 · Missed or late test: 120202022 · Missed or late test: 32022 · Missed or late test: 32022 · Missed or late test: 32023 · Missed or late test: 22023 · Missed or late test: 22024 · Missed or late test: 22024 · Missed or late test: 22025 · Missed or late test: 22025 · Missed or late test: 22025
One square = one violation, by the year it began. Empty columns are years with nothing on EPA's record.
93% missed or late test · 137% notice or report · 1

Across Utah, 81% of violations are missed or late tests and 2% are water over a limit.

Every violation on record

  1. 2025-01-01IronMonitoring, RegularPeriod ended · no return to compliance on file
  2. 2025-01-01ManganeseMonitoring, RegularPeriod ended · no return to compliance on file
  3. 2024-07-01ManganeseMonitoring, RegularBack in compliance
  4. 2024-07-01IronMonitoring, RegularBack in compliance
  5. 2023-07-01IronMonitoring, RegularBack in compliance
  6. 2023-07-01ManganeseMonitoring, RegularBack in compliance
  7. 2022-08-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  8. 2022-05-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  9. 2022-04-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  10. 2019-04-01Revised Total Coliform RuleMONBack in compliance
  11. 2017-10-01Revised Total Coliform RuleOtherBack in compliance
  12. 2017-01-01Chlorine ×3Monitoring and Reporting (DBP)Back in compliance

System details

Population served27
Service connections3
Water sourceGroundwater
System typeTransient Non-Community
OwnerFederal
StatusActive
CityHurricane
EPA ZIP on file84737

Areas served

  • Washington County

Reading this record

Zion Np - East Gate System is a transient non-community that draws from groundwater and serves about 27 people in Hurricane, Utah. Everything above comes from the EPA's Safe Drinking Water Information System (SDWIS), where states report every violation by every public water system.

Four kinds of violation. Only one is a measurement of the water: over the limit means a test came back above a legal maximum (an MCL). A treatment lapse means a required protective step was not done, such as disinfection, filtration, fixing a defect an inspector found, or filing a lead-pipe inventory. A missed or late test means a required test was skipped or never reported. That is the most common kind, and the most misread: it does not mean the water was bad, and it does not mean the water was fine. Notices and reports covers public notices and the annual Consumer Confidence Report.

Status. “Back in compliance” means the state recorded a return to compliance. “Period ended” means the violation's compliance period is over but no return to compliance was ever filed, which is common in older records. EPA's federal copy lags state records by months, so call the utility for anything current.