Town of Jefferson

PWSID: NC0105015

No active violations
This system has no unresolved violations. The most recent violation on record was 2024-10-17.

This system has more violations on record than 91% of water systems in North Carolina.

Violation trend: 1.2 per year over the last 5 years, up from 0.6 per year in the previous 5.

System Details

Population Served1,470
Service Connections850
Water SourceSurface Water
System TypeCommunity Water System
OwnerLocal Government
StatusActive
CityJefferson
EPA ZIP on File28640

Areas Served

  • Jefferson, Ashe County

Lead & Copper Testing

ContaminantLevelEPA Action LevelStatus
Lead (90th percentile)0.0030 mg/L0.015 mg/LBelow Action Level
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level

Violation History (30 total)

ContaminantViolationDateHealth-BasedStatus
5200TT2024-10-17YesReturned to Compliance
5200RPT2024-10-17Returned to Compliance
0300MR2023-09-01 MajorReturned to Compliance
0300MR2023-09-01 MajorReturned to Compliance
0300MR2023-09-01 MajorAcknowledged
0300MR2023-09-01 MajorReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2016-07-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2016-07-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2016-07-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2016-04-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2016-04-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2016-04-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2016-01-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2016-01-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2016-01-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2015-10-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2015-10-01YesReturned to Compliance
2982MCL
Measured: 0.008000 MG/L (limit: 0.005000 MG/L)
2015-10-01YesReturned to Compliance
7500Other2015-08-16Returned to Compliance
7500Other2015-08-16Returned to Compliance
7500Other2015-08-16Returned to Compliance
2950MR2014-03-01 MajorReturned to Compliance
2950MR2014-03-01 MajorReturned to Compliance
2950MR2014-03-01 MajorReturned to Compliance
7500Other2007-06-29Returned to Compliance
5000MR2005-10-01Returned to Compliance
7000Other2003-07-01Returned to Compliance
5000MR2002-01-01Returned to Compliance
7000Other2001-07-01Returned to Compliance
5000MR1993-07-01Returned to Compliance

Understanding This Water System's Record

Town of Jefferson is a community water system water system that draws from surface water sources and serves a population of 1,470 in Jefferson, North Carolina. This page shows its complete compliance history as reported to the EPA's Safe Drinking Water Information System (SDWIS), the federal database that tracks every public water system in the United States.

What Do These Violations Mean?

Health-based violations mean the system exceeded an EPA maximum contaminant level (MCL) or failed to provide required treatment. These indicate potential health risks from contaminants like lead, arsenic, bacteria, nitrates, or disinfection byproducts. Non-health-based violations involve monitoring, reporting, or procedural requirements — the system missed a testing deadline or failed to notify customers, but contaminant levels were not necessarily unsafe.

What Should You Do?

Your water utility is required to publish an annual Consumer Confidence Report (CCR) that details test results and any violations. If your system has active health-based violations, consider a certified water filter rated for the specific contaminants involved. The contaminant guides on this site explain health risks and filter options for common pollutants. For the most current results, contact your water utility directly — EPA data can lag weeks or months behind real-time testing.