Community Water System · PWSID OK2002601

Skyview Mobile Home Park

Serves 24 peopleGroundwaterOwner: PrivateBoise, Idaho
1 open treatment violation.

Open for: Lead service line inventory. EPA counts treatment-technique violations as health-based: a required protective step was not done. It is not a measurement of contamination.

On record since 1979: 201 violations. 4 over the limit · 1 treatment lapse · 191 missed or late tests · 5 notices or reports. Most recent began 2025-09-10.

For this year's test results, ask the utility for its annual Consumer Confidence Report. Every community system must publish one.

4Over the limit
1Treatment lapse1 open
191Missed or late test2 open
5Notice or report2 open

More violations on record than 99% of active water systems in Idaho. Small systems with no staff chemist often rack up missed-test violations; big utilities rarely do.

The record, year by year

1979 · Missed or late test: 21980 · Over the limit: 11980 · Missed or late test: 91980 · Missed or late test: 919801981 · Missed or late test: 81981 · Missed or late test: 81982 · Missed or late test: 71982 · Missed or late test: 71983 · Missed or late test: 519851986 · Over the limit: 11986 · Missed or late test: 81986 · Missed or late test: 81987 · Over the limit: 11987 · Missed or late test: 51989 · Missed or late test: 319901991 · Over the limit: 11991 · Missed or late test: 11993 · Missed or late test: 41994 · Missed or late test: 21995200020052010 · Missed or late test: 120102012 · Notice or report: 12014 · Missed or late test: 12014 · Notice or report: 120152017 · Missed or late test: 212017 · Missed or late test: 212017 · Missed or late test: 212017 · Missed or late test: 212018 · Missed or late test: 12019 · Missed or late test: 32020 · Missed or late test: 220202021 · Missed or late test: 12022 · Missed or late test: 72022 · Missed or late test: 72023 · Missed or late test: 232023 · Missed or late test: 232023 · Missed or late test: 232023 · Missed or late test: 232024 · Treatment lapse: 12024 · Missed or late test: 582024 · Missed or late test: 582024 · Missed or late test: 582024 · Missed or late test: 582024 · Missed or late test: 582024 · Missed or late test: 582024 · Missed or late test: 582024 · Missed or late test: 582024 · Missed or late test: 582024 · Missed or late test: 582024 · Notice or report: 22025 · Missed or late test: 192025 · Missed or late test: 192025 · Missed or late test: 192025 · Missed or late test: 192025 · Notice or report: 12025
One square ≈ 6 violations (rounded up), by the year they began. Empty columns are years with nothing on EPA's record.
2% over the limit · 4<1% treatment lapse · 195% missed or late test · 1912% notice or report · 5

Across Idaho, 80% of violations are missed or late tests and 5% are water over a limit.

Lead & copper at the tap

Utilities sample taps in homes most likely to have lead pipes, and report the 90th-percentile result: 9 in 10 homes sampled came in at or below this number. Above the red line (the action level) the utility must act. The action level is not a safe level; EPA's health goal for lead is zero. EPA's file does not date these results, so they are shown highest first.

Lead, 90th percentile 4 results on file · action level 15 ppb

9.8 ppb
0 ppb
0 ppb
0 ppb

Open now (5)

  1. 2025-09-10E. ColiMonitoring, Source Water (GWR)Open
  2. 2025-07-01Consumer Confidence RuleCCR Complete Failure to ReportOpen
  3. 2025-07-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/ROpen
  4. 2024-10-17Lead service line inventoryRPTOpen
  5. 2024-10-17Lead service line inventoryTTOpen

Every violation on record

  1. 2025-09-10E. ColiMonitoring, Source Water (GWR)Open
  2. 2025-08-01ChlorineMonitoring and Reporting (DBP)Period ended · no return to compliance on file
  3. 2025-07-01Consumer Confidence RuleCCR Complete Failure to ReportOpen
  4. 2025-07-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/ROpen
  5. 2025-07-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  6. 2025-07-01ChlorineMonitoring and Reporting (DBP)Period ended · no return to compliance on file
  7. 2025-06-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  8. 2025-06-01ChlorineMonitoring and Reporting (DBP)Period ended · no return to compliance on file
  9. 2025-05-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  10. 2025-05-01ChlorineMonitoring and Reporting (DBP)Period ended · no return to compliance on file
  11. 2025-04-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  12. 2025-04-01ChlorineMonitoring and Reporting (DBP)Period ended · no return to compliance on file
  13. 2025-03-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  14. 2025-03-01ChlorineMonitoring and Reporting (DBP)Period ended · no return to compliance on file
  15. 2025-02-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  16. 2025-02-01ChlorineMonitoring and Reporting (DBP)Period ended · no return to compliance on file
  17. 2025-01-012, 4-DMonitoring, RegularBack in compliance
  18. 2025-01-01GlyphosateMonitoring, RegularBack in compliance
  19. 2025-01-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  20. 2025-01-01ChlorineMonitoring and Reporting (DBP)Period ended · no return to compliance on file
  21. 2024-10-17Lead service line inventoryRPTOpen
  22. 2024-10-17Lead service line inventoryTTOpen
  23. 2024-10-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  24. 2024-10-01ChlorineMonitoring and Reporting (DBP)Period ended · no return to compliance on file
  25. 2024-09-01Revised Total Coliform RuleMONBack in compliance
Show the other 169 entries
  1. 2024-09-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  2. 2024-08-01Revised Total Coliform RuleMONBack in compliance
  3. 2024-08-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  4. 2024-07-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
  5. 2024-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
  6. 2024-06-01Revised Total Coliform RuleMONBack in compliance
  7. 2024-06-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  8. 2024-04-01ChlordaneMonitoring, RegularPeriod ended · no return to compliance on file
  9. 2024-04-01Total Polychlorinated Biphenyls (PCB)Monitoring, RegularPeriod ended · no return to compliance on file
  10. 2024-04-01Benzo(a)pyreneMonitoring, RegularPeriod ended · no return to compliance on file
  11. 2024-04-01HexachlorobenzeneMonitoring, RegularPeriod ended · no return to compliance on file
  12. 2024-04-01Heptachlor epoxideMonitoring, RegularPeriod ended · no return to compliance on file
  13. 2024-04-01HeptachlorMonitoring, RegularPeriod ended · no return to compliance on file
  14. 2024-04-01CarbofuranMonitoring, RegularPeriod ended · no return to compliance on file
  15. 2024-04-01HexachlorocyclopentadieneMonitoring, RegularPeriod ended · no return to compliance on file
  16. 2024-04-01Di(2-ethylhexyl) phthalateMonitoring, RegularPeriod ended · no return to compliance on file
  17. 2024-04-01OxamylMonitoring, RegularPeriod ended · no return to compliance on file
  18. 2024-04-01Di(2-ethylhexyl) adipateMonitoring, RegularPeriod ended · no return to compliance on file
  19. 2024-04-01GlyphosateMonitoring, RegularBack in compliance
  20. 2024-04-01EndothallMonitoring, RegularPeriod ended · no return to compliance on file
  21. 2024-04-01DiquatMonitoring, RegularPeriod ended · no return to compliance on file
  22. 2024-04-01ToxapheneMonitoring, RegularPeriod ended · no return to compliance on file
  23. 2024-04-01MethoxychlorMonitoring, RegularPeriod ended · no return to compliance on file
  24. 2024-04-01Bhc-GammaMonitoring, RegularPeriod ended · no return to compliance on file
  25. 2024-04-01EndrinMonitoring, RegularPeriod ended · no return to compliance on file
  26. 2024-01-01ChlordaneMonitoring, RegularPeriod ended · no return to compliance on file
  27. 2024-01-01Ethylene DibromideMonitoring, RegularPeriod ended · no return to compliance on file
  28. 2024-01-011, 2-Dibromo-3-ChloropropaneMonitoring, RegularPeriod ended · no return to compliance on file
  29. 2024-01-01Total Polychlorinated Biphenyls (PCB)Monitoring, RegularPeriod ended · no return to compliance on file
  30. 2024-01-01PentachlorophenolMonitoring, RegularPeriod ended · no return to compliance on file
  31. 2024-01-01Benzo(a)pyreneMonitoring, RegularPeriod ended · no return to compliance on file
  32. 2024-01-01HexachlorobenzeneMonitoring, RegularPeriod ended · no return to compliance on file
  33. 2024-01-012, 4, 5-TpMonitoring, RegularPeriod ended · no return to compliance on file
  34. 2024-01-012, 4-DMonitoring, RegularPeriod ended · no return to compliance on file
  35. 2024-01-01Heptachlor epoxideMonitoring, RegularPeriod ended · no return to compliance on file
  36. 2024-01-01HeptachlorMonitoring, RegularPeriod ended · no return to compliance on file
  37. 2024-01-01LassoMonitoring, RegularPeriod ended · no return to compliance on file
  38. 2024-01-01AtrazineMonitoring, RegularPeriod ended · no return to compliance on file
  39. 2024-01-01CarbofuranMonitoring, RegularPeriod ended · no return to compliance on file
  40. 2024-01-01HexachlorocyclopentadieneMonitoring, RegularPeriod ended · no return to compliance on file
  41. 2024-01-01DinosebMonitoring, RegularPeriod ended · no return to compliance on file
  42. 2024-01-01PicloramMonitoring, RegularPeriod ended · no return to compliance on file
  43. 2024-01-01Di(2-ethylhexyl) phthalateMonitoring, RegularPeriod ended · no return to compliance on file
  44. 2024-01-01SimazineMonitoring, RegularPeriod ended · no return to compliance on file
  45. 2024-01-01OxamylMonitoring, RegularPeriod ended · no return to compliance on file
  46. 2024-01-01Di(2-ethylhexyl) adipateMonitoring, RegularPeriod ended · no return to compliance on file
  47. 2024-01-01GlyphosateMonitoring, RegularPeriod ended · no return to compliance on file
  48. 2024-01-01EndothallMonitoring, RegularPeriod ended · no return to compliance on file
  49. 2024-01-01DiquatMonitoring, RegularPeriod ended · no return to compliance on file
  50. 2024-01-01DalaponMonitoring, RegularPeriod ended · no return to compliance on file
  51. 2024-01-01ToxapheneMonitoring, RegularPeriod ended · no return to compliance on file
  52. 2024-01-01MethoxychlorMonitoring, RegularPeriod ended · no return to compliance on file
  53. 2024-01-01Bhc-GammaMonitoring, RegularPeriod ended · no return to compliance on file
  54. 2024-01-01EndrinMonitoring, RegularPeriod ended · no return to compliance on file
  55. 2024-01-01Revised Total Coliform RuleMONBack in compliance
  56. 2024-01-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  57. 2023-11-01Revised Total Coliform RuleMONBack in compliance
  58. 2023-10-01Chlorine ×2Monitoring and Reporting (DBP)Back in compliance
  59. 2023-10-01Revised Total Coliform RuleMONBack in compliance
  60. 2023-09-01Revised Total Coliform RuleMONBack in compliance
  61. 2023-08-01Revised Total Coliform RuleMONBack in compliance
  62. 2023-07-01Chlorine ×3Monitoring and Reporting (DBP)Back in compliance
  63. 2023-07-01Revised Total Coliform RuleMONBack in compliance
  64. 2023-06-01Revised Total Coliform RuleMONBack in compliance
  65. 2023-05-01Revised Total Coliform RuleMONBack in compliance
  66. 2023-04-01Chlorine ×3Monitoring and Reporting (DBP)Back in compliance
  67. 2023-04-01Revised Total Coliform RuleMONBack in compliance
  68. 2023-03-01Revised Total Coliform RuleMONBack in compliance
  69. 2023-02-01Revised Total Coliform RuleMONBack in compliance
  70. 2023-01-01Nitrate-NitriteMonitoring, RegularBack in compliance
  71. 2023-01-01Chlorine ×3Monitoring and Reporting (DBP)Back in compliance
  72. 2023-01-01Revised Total Coliform RuleMONBack in compliance
  73. 2022-11-01Revised Total Coliform RuleMONBack in compliance
  74. 2022-10-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  75. 2022-10-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
  76. 2022-09-01Revised Total Coliform RuleMONBack in compliance
  77. 2022-07-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  78. 2022-01-01Total Haloacetic Acids (HAA5)Monitoring and Reporting (DBP)Period ended · no return to compliance on file
  79. 2022-01-01Trihalomethanes (TTHM)Monitoring and Reporting (DBP)Period ended · no return to compliance on file
  80. 2021-04-02E. ColiMonitoring, Source Water (GWR)Back in compliance
  81. 2020-01-01Revised Total Coliform RuleMONBack in compliance
  82. 2020-01-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  83. 2019-10-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  84. 2019-07-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  85. 2019-04-13E. ColiMonitoring, Source Water (GWR)Back in compliance
  86. 2018-08-15E. ColiMonitoring, Source Water (GWR)Back in compliance
  87. 2017-01-01StyreneMonitoring, RegularPeriod ended · no return to compliance on file
  88. 2017-01-01EthylbenzeneMonitoring, RegularPeriod ended · no return to compliance on file
  89. 2017-01-01TolueneMonitoring, RegularPeriod ended · no return to compliance on file
  90. 2017-01-01BenzeneMonitoring, RegularPeriod ended · no return to compliance on file
  91. 2017-01-01ChlorobenzeneMonitoring, RegularPeriod ended · no return to compliance on file
  92. 2017-01-01TetrachloroethyleneMonitoring, RegularPeriod ended · no return to compliance on file
  93. 2017-01-011,1,2-TrichloroethaneMonitoring, RegularPeriod ended · no return to compliance on file
  94. 2017-01-01TrichloroethyleneMonitoring, RegularPeriod ended · no return to compliance on file
  95. 2017-01-011,2-DichloropropaneMonitoring, RegularPeriod ended · no return to compliance on file
  96. 2017-01-01Carbon tetrachlorideMonitoring, RegularPeriod ended · no return to compliance on file
  97. 2017-01-011,1,1-TrichloroethaneMonitoring, RegularPeriod ended · no return to compliance on file
  98. 2017-01-011,2-DichloroethaneMonitoring, RegularPeriod ended · no return to compliance on file
  99. 2017-01-01trans-1,2-DichloroethyleneMonitoring, RegularPeriod ended · no return to compliance on file
  100. 2017-01-011,1-DichloroethyleneMonitoring, RegularPeriod ended · no return to compliance on file
  101. 2017-01-01Vinyl chlorideMonitoring, RegularPeriod ended · no return to compliance on file
  102. 2017-01-01p-DichlorobenzeneMonitoring, RegularPeriod ended · no return to compliance on file
  103. 2017-01-01o-DichlorobenzeneMonitoring, RegularPeriod ended · no return to compliance on file
  104. 2017-01-01DichloromethaneMonitoring, RegularPeriod ended · no return to compliance on file
  105. 2017-01-01Xylenes, TotalMonitoring, RegularPeriod ended · no return to compliance on file
  106. 2017-01-01cis-1,2-DichloroethyleneMonitoring, RegularPeriod ended · no return to compliance on file
  107. 2017-01-011,2,4-TrichlorobenzeneMonitoring, RegularPeriod ended · no return to compliance on file
  108. 2014-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
  109. 2014-01-01ArsenicMonitoring, RegularBack in compliance
  110. 2012-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
  111. 2010-01-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
  112. 1994-03-01Coliform (TCR)Monitoring, Routine Major (TCR)Back in compliance
  113. 1994-02-01Coliform (TCR)Monitoring, Routine Major (TCR)Back in compliance
  114. 1993-10-01Coliform (TCR)Monitoring, Routine Major (TCR)Back in compliance
  115. 1993-08-01Coliform (TCR)Monitoring, Routine Minor (TCR)Back in compliance
  116. 1993-06-01Coliform (TCR)Monitoring, Routine Major (TCR)Back in compliance
  117. 1993-05-01Coliform (TCR)Monitoring, Routine Minor (TCR)Back in compliance
  118. 1991-09-01Coliform (TCR)MCL, Acute (TCR)Back in compliance
  119. 1991-07-01Coliform (TCR)Monitoring, Routine Minor (TCR)Back in compliance
  120. 1989-03-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  121. 1989-02-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  122. 1989-01-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  123. 1987-09-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  124. 1987-07-01Coliform (Pre-TCR)MCL, Averagemeasured 3.00 Back in compliance
  125. 1987-06-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  126. 1987-05-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  127. 1987-02-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  128. 1987-01-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  129. 1986-10-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  130. 1986-09-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  131. 1986-08-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  132. 1986-07-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  133. 1986-06-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  134. 1986-04-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  135. 1986-03-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  136. 1986-02-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  137. 1986-01-01Coliform (Pre-TCR)MCL, Averagemeasured 40.00 Back in compliance
  138. 1983-12-01Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  139. 1983-08-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  140. 1983-06-30Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  141. 1983-05-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  142. 1983-03-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  143. 1982-12-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  144. 1982-10-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  145. 1982-07-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  146. 1982-04-30Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  147. 1982-03-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  148. 1982-02-28Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  149. 1982-01-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  150. 1981-10-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  151. 1981-09-30Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  152. 1981-08-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  153. 1981-07-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  154. 1981-05-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  155. 1981-03-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  156. 1981-02-28Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  157. 1981-01-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  158. 1980-12-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  159. 1980-10-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  160. 1980-09-30Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  161. 1980-08-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  162. 1980-07-31Coliform (Pre-TCR)Monitoring, Check/Repeat/ConfirmationBack in compliance
  163. 1980-07-31Coliform (Pre-TCR)MCL, Averagemeasured 2.00 · limit 1.00 Back in compliance
  164. 1980-06-30Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  165. 1980-04-30Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  166. 1980-03-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  167. 1980-01-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  168. 1979-12-31Coliform (Pre-TCR)Monitoring, RegularBack in compliance
  169. 1979-11-30Coliform (Pre-TCR)Monitoring, RegularBack in compliance

System details

Population served24
Service connections20
Water sourceGroundwater
System typeCommunity Water System
OwnerPrivate
StatusActive
CityBoise
EPA ZIP on file83701

Areas served

  • Grady County

Reading this record

Skyview Mobile Home Park is a community water system that draws from groundwater and serves about 24 people in Boise, Idaho. Everything above comes from the EPA's Safe Drinking Water Information System (SDWIS), where states report every violation by every public water system.

Four kinds of violation. Only one is a measurement of the water: over the limit means a test came back above a legal maximum (an MCL). A treatment lapse means a required protective step was not done, such as disinfection, filtration, fixing a defect an inspector found, or filing a lead-pipe inventory. A missed or late test means a required test was skipped or never reported. That is the most common kind, and the most misread: it does not mean the water was bad, and it does not mean the water was fine. Notices and reports covers public notices and the annual Consumer Confidence Report.

Status. “Back in compliance” means the state recorded a return to compliance. “Period ended” means the violation's compliance period is over but no return to compliance was ever filed, which is common in older records. EPA's federal copy lags state records by months, so call the utility for anything current.