Sierra Vista RV Park

PWSID: AZ0411383

No active violations
This system has no unresolved violations. The most recent violation on record was 2024-04-01.

This system has more violations on record than 81% of water systems in Arizona.

Violation trend: 8.0 per year over the last 5 years, up from 3.6 per year in the previous 5.

System Details

Population Served200
Service Connections89
Water SourceGroundwater
System TypeCommunity Water System
OwnerPrivate
StatusActive
CityCasa Grande
EPA ZIP on File85193

Areas Served

  • Casa Grande, Pinal County

Lead & Copper Testing

ContaminantLevelEPA Action LevelStatus
Lead (90th percentile)0.0066 mg/L0.015 mg/LBelow Action Level
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level

Violation History (59 total)

ContaminantViolationDateHealth-BasedStatus
1005MCL
Measured: 0.0110 MG/L (limit: 0.0100 MG/L)
2024-04-01YesReturned to Compliance
1005MCL
Measured: 0.0110 MG/L (limit: 0.0100 MG/L)
2024-04-01YesAcknowledged
7500Other2024-03-31Returned to Compliance
7500Other2024-03-31Returned to Compliance
1005MCL
Measured: 0.0120 MG/L (limit: 0.0100 MG/L)
2024-01-01YesAcknowledged
1005MCL
Measured: 0.0120 MG/L (limit: 0.0100 MG/L)
2024-01-01YesReturned to Compliance
1005MCL
Measured: 0.0120 MG/L (limit: 0.0100 MG/L)
2024-01-01YesAcknowledged
3014MR2023-11-23 MajorReturned to Compliance
3014MR2023-11-23 MajorReturned to Compliance
3014MR2023-11-23 MajorReturned to Compliance
1005MCL
Measured: 0.0130 MG/L (limit: 0.0100 MG/L)
2023-10-01YesAcknowledged
1005MCL
Measured: 0.0130 MG/L (limit: 0.0100 MG/L)
2023-10-01YesReturned to Compliance
1005MCL
Measured: 0.0130 MG/L (limit: 0.0100 MG/L)
2023-10-01YesAcknowledged
1005MCL
Measured: 0.0130 MG/L (limit: 0.0100 MG/L)
2023-10-01YesAcknowledged
1005MCL
Measured: 0.0130 MG/L (limit: 0.0100 MG/L)
2023-10-01YesAcknowledged
1005MCL
Measured: 0.0140 MG/L (limit: 0.0100 MG/L)
2023-07-01YesAcknowledged
1005MCL
Measured: 0.0140 MG/L (limit: 0.0100 MG/L)
2023-07-01YesReturned to Compliance
1005MCL
Measured: 0.0140 MG/L (limit: 0.0100 MG/L)
2023-07-01YesAcknowledged
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2023-04-01YesAcknowledged
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2023-04-01YesReturned to Compliance
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2023-04-01YesAcknowledged
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2023-01-01YesAcknowledged
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2023-01-01YesReturned to Compliance
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2023-01-01YesAcknowledged
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2023-01-01YesAcknowledged
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2022-10-01YesAcknowledged
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2022-10-01YesReturned to Compliance
1005MCL
Measured: 0.0150 MG/L (limit: 0.0100 MG/L)
2022-10-01YesAcknowledged
1005MCL
Measured: 0.0150 UG/L (limit: 0.0100 UG/L)
2022-07-01YesAcknowledged
1005MCL
Measured: 0.0150 UG/L (limit: 0.0100 UG/L)
2022-07-01YesReturned to Compliance
1005MCL
Measured: 0.0150 UG/L (limit: 0.0100 UG/L)
2022-07-01YesAcknowledged
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2022-04-01YesAcknowledged
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2022-04-01YesReturned to Compliance
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2022-04-01YesAcknowledged
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2022-01-01YesAcknowledged
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2022-01-01YesReturned to Compliance
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2021-10-01YesAcknowledged
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2021-10-01YesReturned to Compliance
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2021-07-01YesAcknowledged
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2021-07-01YesReturned to Compliance
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2021-04-01YesAcknowledged
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2021-04-01YesReturned to Compliance
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2021-01-01YesAcknowledged
1005MCL
Measured: 0.0160 MG/L (limit: 0.0100 MG/L)
2021-01-01YesReturned to Compliance
1005MCL
Measured: 0.0120 MG/L (limit: 0.0100 MG/L)
2020-10-01YesReturned to Compliance
1005MCL
Measured: 0.0120 MG/L (limit: 0.0100 MG/L)
2020-10-01YesReturned to Compliance
8000RPT2020-10-01Returned to Compliance
7500Other2020-07-02Returned to Compliance
5000MR2020-07-01Returned to Compliance
1005MCL
Measured: 16.00 UG/L (limit: 10.00 UG/L)
2020-01-01YesAcknowledged

Showing 50 of 59 historical violations.

Understanding This Water System's Record

Sierra Vista RV Park is a community water system water system that draws from groundwater sources and serves a population of 200 in Casa Grande, Arizona. This page shows its complete compliance history as reported to the EPA's Safe Drinking Water Information System (SDWIS), the federal database that tracks every public water system in the United States.

What Do These Violations Mean?

Health-based violations mean the system exceeded an EPA maximum contaminant level (MCL) or failed to provide required treatment. These indicate potential health risks from contaminants like lead, arsenic, bacteria, nitrates, or disinfection byproducts. Non-health-based violations involve monitoring, reporting, or procedural requirements — the system missed a testing deadline or failed to notify customers, but contaminant levels were not necessarily unsafe.

What Should You Do?

Your water utility is required to publish an annual Consumer Confidence Report (CCR) that details test results and any violations. If your system has active health-based violations, consider a certified water filter rated for the specific contaminants involved. The contaminant guides on this site explain health risks and filter options for common pollutants. For the most current results, contact your water utility directly — EPA data can lag weeks or months behind real-time testing.