Pine Hill Egg Ranch
Open for: Lead service line inventory. EPA counts treatment-technique violations as health-based: a required protective step was not done. It is not a measurement of contamination.
On record since 2023: 13 violations. 11 over the limit · 1 treatment lapse · 1 notice or report. Most recent began 2025-01-01.
For this year's test results, ask the utility for its annual Consumer Confidence Report. Every community system must publish one.
More violations on record than 90% of active water systems in California. Small systems with no staff chemist often rack up missed-test violations; big utilities rarely do.
The record, year by year
Across California, 52% of violations are missed or late tests and 29% are water over a limit.
How far over the limit
Lead & copper at the tap
Utilities sample taps in homes most likely to have lead pipes, and report the 90th-percentile result: 9 in 10 homes sampled came in at or below this number. Above the red line (the action level) the utility must act. The action level is not a safe level; EPA's health goal for lead is zero. EPA's file does not date these results, so they are shown highest first.
Lead, 90th percentile 2 results on file · action level 15 ppb
Open now (2)
- 2024-10-17Lead service line inventoryTTOpen
- 2024-10-17Lead service line inventoryRPTOpen
Every violation on record
- 2025-01-01Combined UraniumMCL, Averagemeasured 52.00 PCI/L · limit 20.00 PCI/LBack in compliance
- 2025-01-01NitrateMCL, Single Samplemeasured 42.00 MG/L · limit 10.00 MG/LPeriod ended · no return to compliance on file
- 2024-10-17Lead service line inventoryTTOpen
- 2024-10-17Lead service line inventoryRPTOpen
- 2024-10-01NitrateMCL, Single Samplemeasured 35.00 MG/L · limit 10.00 MG/LPeriod ended · no return to compliance on file
- 2024-10-01Combined UraniumMCL, Averagemeasured 50.00 PCI/L · limit 20.00 PCI/LBack in compliance
- 2024-07-01NitrateMCL, Single Samplemeasured 42.00 MG/L · limit 10.00 MG/LBack in compliance
- 2024-07-01Combined UraniumMCL, Averagemeasured 34.00 PCI/L · limit 20.00 PCI/LBack in compliance
- 2024-04-01NitrateMCL, Single Samplemeasured 38.00 MG/L · limit 10.00 MG/LBack in compliance
- 2024-04-01Combined UraniumMCL, Averagemeasured 24.00 PCI/L · limit 20.00 PCI/LBack in compliance
- 2024-01-01NitrateMCL, Single Samplemeasured 38.50 MG/L · limit 10.00 MG/LBack in compliance
- 2023-10-01NitrateMCL, Single Samplemeasured 25.00 MG/L · limit 10.00 MG/LPeriod ended · no return to compliance on file
- 2023-07-01NitrateMCL, Single Samplemeasured 25.00 MG/L · limit 10.00 MG/LPeriod ended · no return to compliance on file
System details
| Population served | 40 |
| Service connections | 4 |
| Water source | Groundwater |
| System type | Non-Transient Non-Community |
| Owner | Private |
| Status | Active |
| City | Ramona |
| EPA ZIP on file | 92065 |
Areas served
- San Diego County
Reading this record
Pine Hill Egg Ranch is a non-transient non-community that draws from groundwater and serves about 40 people in Ramona, California. Everything above comes from the EPA's Safe Drinking Water Information System (SDWIS), where states report every violation by every public water system.
Four kinds of violation. Only one is a measurement of the water: over the limit means a test came back above a legal maximum (an MCL). A treatment lapse means a required protective step was not done, such as disinfection, filtration, fixing a defect an inspector found, or filing a lead-pipe inventory. A missed or late test means a required test was skipped or never reported. That is the most common kind, and the most misread: it does not mean the water was bad, and it does not mean the water was fine. Notices and reports covers public notices and the annual Consumer Confidence Report.
Status. “Back in compliance” means the state recorded a return to compliance. “Period ended” means the violation's compliance period is over but no return to compliance was ever filed, which is common in older records. EPA's federal copy lags state records by months, so call the utility for anything current.