Transient Non-Community · PWSID NC4035002

New Hope Worship Center

Serves 120 peopleGroundwaterOwner: PrivateBunn, North Carolina
Nothing open right now.

On record since 2003: 42 violations. 5 missed or late tests · 37 notices or reports. Most recent began 2019-05-01.

None of them is a measurement of contaminated water.

For this year's test results, ask the utility for its annual Consumer Confidence Report. Every community system must publish one.

0Over the limit
0Treatment lapse
5Missed or late test
37Notice or report

More violations on record than 97% of active water systems in North Carolina. Small systems with no staff chemist often rack up missed-test violations; big utilities rarely do.

The record, year by year

2003 · Notice or report: 22003 · Notice or report: 22005 · Missed or late test: 22005 · Missed or late test: 22005 · Notice or report: 42005 · Notice or report: 42005 · Notice or report: 42005 · Notice or report: 420052007 · Notice or report: 62007 · Notice or report: 62007 · Notice or report: 62007 · Notice or report: 62007 · Notice or report: 62007 · Notice or report: 62008 · Notice or report: 52008 · Notice or report: 52008 · Notice or report: 52008 · Notice or report: 52008 · Notice or report: 52009 · Notice or report: 62009 · Notice or report: 62009 · Notice or report: 62009 · Notice or report: 62009 · Notice or report: 62009 · Notice or report: 62010 · Notice or report: 62010 · Notice or report: 62010 · Notice or report: 62010 · Notice or report: 62010 · Notice or report: 62010 · Notice or report: 620102011 · Missed or late test: 12011 · Notice or report: 22011 · Notice or report: 22012 · Notice or report: 42012 · Notice or report: 42012 · Notice or report: 42012 · Notice or report: 42013 · Notice or report: 12015 · Notice or report: 120152017 · Missed or late test: 12019 · Missed or late test: 120202025
One square = one violation, by the year it began. Empty columns are years with nothing on EPA's record.
12% missed or late test · 588% notice or report · 37

Across North Carolina, 39% of violations are missed or late tests and 2% are water over a limit.

Every violation on record

  1. 2019-05-01Revised Total Coliform RuleMONBack in compliance
  2. 2017-10-01Revised Total Coliform RuleMONBack in compliance
  3. 2015-03-21Public NoticePN Violation for NPDWR ViolationBack in compliance
  4. 2013-12-13Public NoticePN Violation for NPDWR ViolationBack in compliance
  5. 2012-10-20Public NoticePN Violation for NPDWR ViolationBack in compliance
  6. 2012-09-23Public Notice ×2PN Violation for NPDWR ViolationBack in compliance
  7. 2012-06-03Public NoticePN Violation for NPDWR ViolationBack in compliance
  8. 2011-06-17E. ColiMonitoring, Source Water (GWR)Back in compliance
  9. 2011-03-31Public NoticePN Violation for NPDWR ViolationBack in compliance
  10. 2011-01-08Public NoticePN Violation for NPDWR ViolationBack in compliance
  11. 2010-10-23Public NoticePN Violation for NPDWR ViolationBack in compliance
  12. 2010-08-07Public NoticePN Violation for NPDWR ViolationBack in compliance
  13. 2010-05-27Public NoticePN Violation for NPDWR ViolationBack in compliance
  14. 2010-04-25Public NoticePN Violation for NPDWR ViolationBack in compliance
  15. 2010-04-17Public NoticePN Violation for NPDWR ViolationBack in compliance
  16. 2010-02-11Public NoticePN Violation for NPDWR ViolationBack in compliance
  17. 2009-10-30Public NoticePN Violation for NPDWR ViolationBack in compliance
  18. 2009-07-18Public NoticePN Violation for NPDWR ViolationBack in compliance
  19. 2009-07-12Public NoticePN Violation for NPDWR ViolationBack in compliance
  20. 2009-05-29Public NoticePN Violation for NPDWR ViolationBack in compliance
  21. 2009-04-19Public NoticePN Violation for NPDWR ViolationBack in compliance
  22. 2009-02-19Public NoticePN Violation for NPDWR ViolationBack in compliance
  23. 2008-10-15Public NoticePN Violation for NPDWR ViolationBack in compliance
  24. 2008-05-24Public NoticePN Violation for NPDWR ViolationBack in compliance
  25. 2008-05-23Public NoticePN Violation for NPDWR ViolationBack in compliance
Show the other 16 entries
  1. 2008-03-21Public NoticePN Violation for NPDWR ViolationBack in compliance
  2. 2008-02-20Public NoticePN Violation for NPDWR ViolationBack in compliance
  3. 2007-12-08Public NoticePN Violation for NPDWR ViolationBack in compliance
  4. 2007-10-14Public NoticePN Violation for NPDWR ViolationBack in compliance
  5. 2007-08-31Public NoticePN Violation for NPDWR ViolationBack in compliance
  6. 2007-07-22Public NoticePN Violation for NPDWR ViolationBack in compliance
  7. 2007-06-24Public NoticePN Violation for NPDWR ViolationBack in compliance
  8. 2007-03-14Public NoticePN Violation for NPDWR ViolationBack in compliance
  9. 2005-11-20Public NoticePN Violation without NPDWR ViolationBack in compliance
  10. 2005-05-10Public NoticePN Violation without NPDWR ViolationBack in compliance
  11. 2005-04-02Public NoticePN Violation without NPDWR ViolationBack in compliance
  12. 2005-02-16Public NoticePN Violation without NPDWR ViolationBack in compliance
  13. 2005-01-01NitriteMonitoring, RegularBack in compliance
  14. 2005-01-01NitrateMonitoring, RegularBack in compliance
  15. 2003-08-13Public NoticePN Violation without NPDWR ViolationBack in compliance
  16. 2003-02-16Public NoticePN Violation without NPDWR ViolationBack in compliance

System details

Population served120
Service connections2
Water sourceGroundwater
System typeTransient Non-Community
OwnerPrivate
StatusActive
CityBunn
EPA ZIP on file27508

Areas served

  • Louisburg, Franklin County

Reading this record

New Hope Worship Center is a transient non-community that draws from groundwater and serves about 120 people in Bunn, North Carolina. Everything above comes from the EPA's Safe Drinking Water Information System (SDWIS), where states report every violation by every public water system.

Four kinds of violation. Only one is a measurement of the water: over the limit means a test came back above a legal maximum (an MCL). A treatment lapse means a required protective step was not done, such as disinfection, filtration, fixing a defect an inspector found, or filing a lead-pipe inventory. A missed or late test means a required test was skipped or never reported. That is the most common kind, and the most misread: it does not mean the water was bad, and it does not mean the water was fine. Notices and reports covers public notices and the annual Consumer Confidence Report.

Status. “Back in compliance” means the state recorded a return to compliance. “Period ended” means the violation's compliance period is over but no return to compliance was ever filed, which is common in older records. EPA's federal copy lags state records by months, so call the utility for anything current.