Lakeview Ranchos Mutual Water Company
On record since 2007: 38 violations. 34 over the limit · 4 missed or late tests. Most recent began 2023-04-01.
For this year's test results, ask the utility for its annual Consumer Confidence Report. Every community system must publish one.
More violations on record than 96% of active water systems in California. Small systems with no staff chemist often rack up missed-test violations; big utilities rarely do.
The record, year by year
Across California, 52% of violations are missed or late tests and 29% are water over a limit.
How far over the limit
Lead & copper at the tap
Utilities sample taps in homes most likely to have lead pipes, and report the 90th-percentile result: 9 in 10 homes sampled came in at or below this number. Above the red line (the action level) the utility must act. The action level is not a safe level; EPA's health goal for lead is zero. EPA's file does not date these results, so they are shown highest first.
Lead, 90th percentile 3 results on file · action level 15 ppb
Every violation on record
- 2023-04-01ArsenicMCL, Averagemeasured 0.0650 MG/LPeriod ended · no return to compliance on file
- 2023-01-01ArsenicMCL, Averagemeasured 0.0670 MG/LPeriod ended · no return to compliance on file
- 2022-10-01ArsenicMCL, Averagemeasured 0.0350 MG/LPeriod ended · no return to compliance on file
- 2022-07-01ArsenicMCL, Averagemeasured 0.0300 MG/LPeriod ended · no return to compliance on file
- 2022-04-01ArsenicMCL, Averagemeasured 0.0290 MG/LPeriod ended · no return to compliance on file
- 2022-01-01ArsenicMCL, Averagemeasured 0.0350 MG/LPeriod ended · no return to compliance on file
- 2021-10-01ArsenicMCL, Averagemeasured 0.0160 MG/LPeriod ended · no return to compliance on file
- 2021-07-01ArsenicMCL, Averagemeasured 0.0230 MG/LPeriod ended · no return to compliance on file
- 2021-04-01ArsenicMCL, Averagemeasured 0.0260 MG/LPeriod ended · no return to compliance on file
- 2021-01-01ArsenicMCL, Averagemeasured 0.0210 MG/LPeriod ended · no return to compliance on file
- 2020-10-01ArsenicMCL, Averagemeasured 0.0250 MG/LPeriod ended · no return to compliance on file
- 2020-07-01ArsenicMCL, Averagemeasured 0.0360 MG/LPeriod ended · no return to compliance on file
- 2020-01-01ArsenicMCL, Averagemeasured 0.0410 MG/LPeriod ended · no return to compliance on file
- 2019-10-01ArsenicMCL, Averagemeasured 0.0530 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2019-07-01ArsenicMCL, Averagemeasured 0.0530 MG/LPeriod ended · no return to compliance on file
- 2019-04-01ArsenicMCL, Averagemeasured 0.0530 MG/LPeriod ended · no return to compliance on file
- 2019-01-01Combined UraniumMCL, Averagemeasured 21.00 PCI/LPeriod ended · no return to compliance on file
- 2019-01-01ArsenicMCL, Averagemeasured 0.0340 MG/LPeriod ended · no return to compliance on file
- 2018-10-01ArsenicMCL, Averagemeasured 0.0260 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2018-07-01ArsenicMCL, Averagemeasured 0.0250 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2018-04-01Combined UraniumMCL, Averagemeasured 21.00 PCI/L · limit 20.00 PCI/LPeriod ended · no return to compliance on file
- 2018-04-01ArsenicMCL, Averagemeasured 0.0330 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2018-01-01ArsenicMCL, Averagemeasured 0.0560 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2017-10-01ArsenicMCL, Averagemeasured 0.0890 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2017-07-01ArsenicMCL, Averagemeasured 0.0880 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
Show the other 12 entries
- 2017-04-01ArsenicMCL, Averagemeasured 0.0800 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2017-01-01ArsenicMCL, Averagemeasured 0.0650 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2016-10-01ArsenicMCL, Averagemeasured 0.0360 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2016-07-01ArsenicMCL, Averagemeasured 0.0370 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2016-04-01ArsenicMCL, Averagemeasured 0.0430 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2016-01-01Combined Uranium ×2MCL, Averagemeasured 26.00 PCI/L · limit 20.00 PCI/LPeriod ended · no return to compliance on file
- 2016-01-01ArsenicMCL, Averagemeasured 0.0420 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2013-07-01Combined Radium (-226 and -228)MCL, Averagemeasured 45.00 PCI/L · limit 5.00 PCI/LBack in compliance
- 2008-10-01ArsenicMonitoring, RegularBack in compliance
- 2008-07-01ArsenicMonitoring, RegularBack in compliance
- 2008-01-01ArsenicMonitoring, RegularBack in compliance
- 2007-10-01ArsenicMonitoring, RegularBack in compliance
System details
| Population served | 120 |
| Service connections | 71 |
| Water source | Groundwater |
| System type | Community Water System |
| Owner | Private |
| Status | Active |
| City | Weldon |
| EPA ZIP on file | 93283 |
Areas served
- Kern County
Reading this record
Lakeview Ranchos Mutual Water Company is a community water system that draws from groundwater and serves about 120 people in Weldon, California. Everything above comes from the EPA's Safe Drinking Water Information System (SDWIS), where states report every violation by every public water system.
Four kinds of violation. Only one is a measurement of the water: over the limit means a test came back above a legal maximum (an MCL). A treatment lapse means a required protective step was not done, such as disinfection, filtration, fixing a defect an inspector found, or filing a lead-pipe inventory. A missed or late test means a required test was skipped or never reported. That is the most common kind, and the most misread: it does not mean the water was bad, and it does not mean the water was fine. Notices and reports covers public notices and the annual Consumer Confidence Report.
Status. “Back in compliance” means the state recorded a return to compliance. “Period ended” means the violation's compliance period is over but no return to compliance was ever filed, which is common in older records. EPA's federal copy lags state records by months, so call the utility for anything current.