Community Water System · PWSID NJ0607001

Hopewell Place Senior Apts

Serves 100 peopleGroundwaterOwner: PrivateBridgeton, New Jersey
Nothing open that measures the water, but 3 open testing or paperwork violations.

A missed test is not evidence of bad water. It also is not evidence of good water: for that period nobody checked.

On record since 2013: 97 violations. 6 over the limit · 4 treatment lapses · 70 missed or late tests · 17 notices or reports. Most recent began 2025-04-01.

For this year's test results, ask the utility for its annual Consumer Confidence Report. Every community system must publish one.

6Over the limit
4Treatment lapse
70Missed or late test3 open
17Notice or report

More violations on record than 98% of active water systems in New Jersey. Small systems with no staff chemist often rack up missed-test violations; big utilities rarely do.

The record, year by year

200520102013 · Missed or late test: 12015 · Notice or report: 120152016 · Missed or late test: 12017 · Missed or late test: 12018 · Missed or late test: 72018 · Missed or late test: 72018 · Missed or late test: 72019 · Missed or late test: 102019 · Missed or late test: 102019 · Missed or late test: 102019 · Missed or late test: 102019 · Notice or report: 12020 · Notice or report: 220202021 · Treatment lapse: 12021 · Missed or late test: 72021 · Missed or late test: 72021 · Missed or late test: 72021 · Notice or report: 12022 · Over the limit: 12022 · Missed or late test: 142022 · Missed or late test: 142022 · Missed or late test: 142022 · Missed or late test: 142022 · Missed or late test: 142022 · Notice or report: 32023 · Over the limit: 52023 · Over the limit: 52023 · Treatment lapse: 12023 · Missed or late test: 172023 · Missed or late test: 172023 · Missed or late test: 172023 · Missed or late test: 172023 · Missed or late test: 172023 · Missed or late test: 172023 · Notice or report: 72023 · Notice or report: 72023 · Notice or report: 72024 · Treatment lapse: 22024 · Missed or late test: 112024 · Missed or late test: 112024 · Missed or late test: 112024 · Missed or late test: 112024 · Notice or report: 22025 · Missed or late test: 12025
One square ≈ 3 violations (rounded up), by the year they began. Empty columns are years with nothing on EPA's record.
6% over the limit · 64% treatment lapse · 472% missed or late test · 7018% notice or report · 17

Across New Jersey, 74% of violations are missed or late tests and 2% are water over a limit.

How far over the limit

at the limit2×5×10×100×+Gross Alpha, Excl. Radon and UCombined Radium (-226 and...2023-10-01 · Gross Alpha, Excl. Radon and U: measured 29.00 PCI/L vs limit 15.00 PCI/L (1.9×)2023-07-01 · Gross Alpha, Excl. Radon and U: measured 39.00 PCI/L vs limit 15.00 PCI/L (2.6×)2023-04-01 · Combined Radium (-226 and -228): measured 6.00 PCI/L vs limit 5.00 PCI/L (1.2×)2023-04-01 · Gross Alpha, Excl. Radon and U: measured 50.00 PCI/L vs limit 15.00 PCI/L (3.3×)
Each dot is one over-the-limit violation: the measured value divided by the limit it broke, on a log scale. Most legal limits for chemicals are running averages set for a lifetime of drinking, so “just over” and “ten times over” are very different news. Hover a dot for the numbers.

Lead & copper at the tap

Utilities sample taps in homes most likely to have lead pipes, and report the 90th-percentile result: 9 in 10 homes sampled came in at or below this number. Above the red line (the action level) the utility must act. The action level is not a safe level; EPA's health goal for lead is zero. EPA's file does not date these results, so they are shown highest first.

Lead, 90th percentile 13 results on file · action level 15 ppb

1.1 ppb
0.88 ppb
0.75 ppb
0.6 ppb
0.38 ppb
0.35 ppb
0 ppb
0 ppb
0 ppb
0 ppb
0 ppb
0 ppb
0 ppb

Copper, 90th percentile 1 result on file · action level 1.3 mg/L

2.1 mg/L

Open now (3)

  1. 2025-04-01Lead and Copper RuleLead Consumer NoticeOpen
  2. 2024-09-29Lead and Copper RuleLead Consumer NoticeOpen
  3. 2024-03-31Lead and Copper RuleLead Consumer NoticeOpen

Every violation on record

  1. 2025-04-01Lead and Copper RuleLead Consumer NoticeOpen
  2. 2024-09-29Lead and Copper RuleLead Consumer NoticeOpen
  3. 2024-08-22Revised Total Coliform RuleRPTBack in compliance
  4. 2024-07-01Lead and Copper RuleWQP Entry Point/Tap Treatment Technique Non-CompliancePeriod ended · no return to compliance on file
  5. 2024-07-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  6. 2024-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
  7. 2024-07-01Revised Total Coliform RuleMONBack in compliance
  8. 2024-04-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  9. 2024-03-31Lead and Copper RuleLead Consumer NoticeOpen
  10. 2024-01-01Lead and Copper RuleWQP Entry Point/Tap Treatment Technique Non-CompliancePeriod ended · no return to compliance on file
  11. 2024-01-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  12. 2024-01-01Radium-228Monitoring, RegularBack in compliance
  13. 2024-01-01Radium-226Monitoring, RegularBack in compliance
  14. 2024-01-01Combined Radium (-226 and -228)Monitoring, RegularBack in compliance
  15. 2024-01-01Combined UraniumMonitoring, RegularBack in compliance
  16. 2024-01-01Gross Alpha, Excl. Radon and UMonitoring, RegularBack in compliance
  17. 2023-10-01Gross Alpha, Excl. Radon and UMCL, Averagemeasured 29.00 PCI/L · limit 15.00 PCI/LBack in compliance
  18. 2023-10-01Radium-228Monitoring, RegularBack in compliance
  19. 2023-10-01Radium-226Monitoring, RegularBack in compliance
  20. 2023-10-01Combined Radium (-226 and -228)Monitoring, RegularBack in compliance
  21. 2023-10-01Combined UraniumMonitoring, RegularBack in compliance
  22. 2023-10-01Gross Alpha, Excl. Radon and UMonitoring, RegularBack in compliance
  23. 2023-07-09Public NoticePN Violation without NPDWR ViolationBack in compliance
  24. 2023-07-08Public Notice ×2PN Violation for NPDWR ViolationBack in compliance
  25. 2023-07-01Lead and Copper RuleWater Quality Parameter M/RBack in compliance
Show the other 69 entries
  1. 2023-07-01Lead and Copper RuleWQP Entry Point/Tap Treatment Technique Non-CompliancePeriod ended · no return to compliance on file
  2. 2023-07-01Gross Alpha, Excl. Radon and UMCL, Averagemeasured 39.00 PCI/L · limit 15.00 PCI/LPeriod ended · no return to compliance on file
  3. 2023-07-01Radium-228Monitoring, RegularBack in compliance
  4. 2023-07-01Radium-226Monitoring, RegularBack in compliance
  5. 2023-07-01Combined Radium (-226 and -228)Monitoring, RegularBack in compliance
  6. 2023-07-01Combined UraniumMonitoring, RegularBack in compliance
  7. 2023-07-01Gross Alpha, Excl. Radon and UMonitoring, RegularBack in compliance
  8. 2023-06-10Public Notice ×2PN Violation without NPDWR ViolationBack in compliance
  9. 2023-06-10Public Notice ×2PN Violation for NPDWR ViolationBack in compliance
  10. 2023-04-01Combined Radium (-226 and -228)MCL, Averagemeasured 6.00 PCI/L · limit 5.00 PCI/LPeriod ended · no return to compliance on file
  11. 2023-04-01Gross Alpha, Excl. Radon and UMCL, Averagemeasured 50.00 PCI/L · limit 15.00 PCI/LPeriod ended · no return to compliance on file
  12. 2023-01-01Gross Alpha, Excl. Radon and UMCL, Averagemeasured 25.73 PCI/LPeriod ended · no return to compliance on file
  13. 2023-01-01Radium-228Monitoring, RegularBack in compliance
  14. 2023-01-01Radium-226Monitoring, RegularBack in compliance
  15. 2023-01-01Combined Radium (-226 and -228)Monitoring, RegularBack in compliance
  16. 2023-01-01Combined UraniumMonitoring, RegularBack in compliance
  17. 2023-01-01Gross Alpha, Excl. Radon and UMonitoring, RegularBack in compliance
  18. 2023-01-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
  19. 2022-10-01Gross Alpha, Excl. Radon and UMCL, Averagemeasured 17.15 PCI/LPeriod ended · no return to compliance on file
  20. 2022-10-01Radium-228Monitoring, RegularBack in compliance
  21. 2022-10-01Radium-226Monitoring, RegularBack in compliance
  22. 2022-10-01Combined Radium (-226 and -228)Monitoring, RegularBack in compliance
  23. 2022-10-01Combined UraniumMonitoring, RegularBack in compliance
  24. 2022-10-01Gross Alpha, Excl. Radon and UMonitoring, RegularBack in compliance
  25. 2022-10-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  26. 2022-09-29Lead and Copper RuleLead Consumer NoticeBack in compliance
  27. 2022-07-01Lead and Copper RuleWater Quality Parameter M/RBack in compliance
  28. 2022-06-11Revised Total Coliform RuleRPTBack in compliance
  29. 2022-05-01Revised Total Coliform RuleMONBack in compliance
  30. 2022-04-11Revised Total Coliform RuleRPTBack in compliance
  31. 2022-04-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  32. 2022-03-11Revised Total Coliform RuleRPTBack in compliance
  33. 2022-03-01Revised Total Coliform RuleMONBack in compliance
  34. 2022-01-01NitrateMonitoring, RegularBack in compliance
  35. 2022-01-01Lead and Copper RuleWater Quality Parameter M/RBack in compliance
  36. 2022-01-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  37. 2021-07-01Radium-228Monitoring, RegularBack in compliance
  38. 2021-07-01Radium-226Monitoring, RegularBack in compliance
  39. 2021-07-01Combined Radium (-226 and -228)Monitoring, RegularBack in compliance
  40. 2021-07-01Combined UraniumMonitoring, RegularBack in compliance
  41. 2021-07-01Gross Alpha, Excl. Radon and UMonitoring, RegularBack in compliance
  42. 2021-04-25Lead and Copper RuleOCCT/SOWT Treatment Installation/DemonstrationBack in compliance
  43. 2021-03-11Revised Total Coliform RuleRPTBack in compliance
  44. 2021-02-01Revised Total Coliform RuleMONBack in compliance
  45. 2021-01-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  46. 2020-10-01Consumer Confidence RuleCCR Inadequate ReportingBack in compliance
  47. 2020-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
  48. 2019-09-11Revised Total Coliform RuleRPTBack in compliance
  49. 2019-08-01Revised Total Coliform RuleMONBack in compliance
  50. 2019-07-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  51. 2019-07-01Radium-228Monitoring, RegularBack in compliance
  52. 2019-07-01Radium-226Monitoring, RegularBack in compliance
  53. 2019-07-01Combined Radium (-226 and -228)Monitoring, RegularBack in compliance
  54. 2019-07-01Combined UraniumMonitoring, RegularBack in compliance
  55. 2019-07-01Gross Alpha, Excl. Radon and UMonitoring, RegularBack in compliance
  56. 2019-01-011, 2-Dibromo-3-ChloropropaneMonitoring, RegularBack in compliance
  57. 2019-01-01Ethylene DibromideMonitoring, RegularBack in compliance
  58. 2019-01-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
  59. 2018-07-01Radium-228Monitoring, RegularBack in compliance
  60. 2018-07-01Radium-226Monitoring, RegularBack in compliance
  61. 2018-07-01Combined Radium (-226 and -228)Monitoring, RegularBack in compliance
  62. 2018-07-01Combined UraniumMonitoring, RegularBack in compliance
  63. 2018-07-01Gross Alpha, Excl. Radon and UMonitoring, RegularBack in compliance
  64. 2018-04-01Lead and Copper RuleLead Consumer NoticeBack in compliance
  65. 2018-01-01Lead and Copper RuleWater Quality Parameter M/RBack in compliance
  66. 2017-10-01Lead and Copper RuleLead Consumer NoticeBack in compliance
  67. 2016-04-01ChlorineMonitoring and Reporting (DBP)Back in compliance
  68. 2015-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
  69. 2013-01-18E. ColiMonitoring, Source Water (GWR)Back in compliance

System details

Population served100
Service connections1
Water sourceGroundwater
System typeCommunity Water System
OwnerPrivate
StatusActive
CityBridgeton
EPA ZIP on file08302

Areas served

  • Cumberland County

Reading this record

Hopewell Place Senior Apts is a community water system that draws from groundwater and serves about 100 people in Bridgeton, New Jersey. Everything above comes from the EPA's Safe Drinking Water Information System (SDWIS), where states report every violation by every public water system.

Four kinds of violation. Only one is a measurement of the water: over the limit means a test came back above a legal maximum (an MCL). A treatment lapse means a required protective step was not done, such as disinfection, filtration, fixing a defect an inspector found, or filing a lead-pipe inventory. A missed or late test means a required test was skipped or never reported. That is the most common kind, and the most misread: it does not mean the water was bad, and it does not mean the water was fine. Notices and reports covers public notices and the annual Consumer Confidence Report.

Status. “Back in compliance” means the state recorded a return to compliance. “Period ended” means the violation's compliance period is over but no return to compliance was ever filed, which is common in older records. EPA's federal copy lags state records by months, so call the utility for anything current.