Hi-Line Colony

PWSID: MT0005185

No active violations
This system has no unresolved violations. The most recent violation on record was 2025-07-01.

This system has more violations on record than 91% of water systems in Montana.

Violation trend: 10.2 per year over the last 5 years.

System Details

Population Served92
Service Connections18
Water SourceGroundwater
System TypeCommunity Water System
OwnerPrivate
StatusActive
CityChester
EPA ZIP on File59522

Areas Served

  • Whitlash, Liberty County

Lead & Copper Testing

ContaminantLevelEPA Action LevelStatus
Lead (90th percentile)0.0000 mg/L0.015 mg/LBelow Action Level

Violation History (51 total)

ContaminantViolationDateHealth-BasedStatus
5000MR2025-07-01Returned to Compliance
2036MR2025-04-01 MajorAcknowledged
2036MR2025-04-01 MajorReturned to Compliance
2037MR2025-04-01 MajorAcknowledged
2037MR2025-04-01 MajorReturned to Compliance
2039MR2025-04-01 MajorAcknowledged
2039MR2025-04-01 MajorReturned to Compliance
2040MR2025-04-01 MajorAcknowledged
2040MR2025-04-01 MajorReturned to Compliance
2041MR2025-04-01 MajorAcknowledged
2041MR2025-04-01 MajorReturned to Compliance
2042MR2025-04-01 MajorAcknowledged
2042MR2025-04-01 MajorReturned to Compliance
2046MR2025-04-01 MajorAcknowledged
2046MR2025-04-01 MajorReturned to Compliance
2050MR2025-04-01 MajorAcknowledged
2050MR2025-04-01 MajorReturned to Compliance
2051MR2025-04-01 MajorAcknowledged
2051MR2025-04-01 MajorReturned to Compliance
2065MR2025-04-01 MajorAcknowledged
2065MR2025-04-01 MajorReturned to Compliance
2067MR2025-04-01 MajorAcknowledged
2067MR2025-04-01 MajorReturned to Compliance
2105MR2025-04-01 MajorAcknowledged
2105MR2025-04-01 MajorReturned to Compliance
2110MR2025-04-01 MajorAcknowledged
2110MR2025-04-01 MajorReturned to Compliance
2274MR2025-04-01 MajorAcknowledged
2274MR2025-04-01 MajorReturned to Compliance
2306MR2025-04-01 MajorAcknowledged
2306MR2025-04-01 MajorReturned to Compliance
2326MR2025-04-01 MajorAcknowledged
2326MR2025-04-01 MajorReturned to Compliance
2959MR2025-04-01 MajorAcknowledged
2959MR2025-04-01 MajorReturned to Compliance
8000MON2025-04-01 MajorReturned to Compliance
8000MON2025-04-01 MajorReturned to Compliance
2005MR2025-04-01 MajorAcknowledged
2005MR2025-04-01 MajorReturned to Compliance
2010MR2025-04-01 MajorAcknowledged
2010MR2025-04-01 MajorReturned to Compliance
2015MR2025-04-01 MajorAcknowledged
2015MR2025-04-01 MajorReturned to Compliance
2020MR2025-04-01 MajorAcknowledged
2020MR2025-04-01 MajorReturned to Compliance
2031MR2025-04-01 MajorAcknowledged
2031MR2025-04-01 MajorReturned to Compliance
2035MR2025-04-01 MajorAcknowledged
2035MR2025-04-01 MajorReturned to Compliance
8000MON2025-03-01 MajorAcknowledged

Showing 50 of 51 historical violations.

Understanding This Water System's Record

Hi-Line Colony is a community water system water system that draws from groundwater sources and serves a population of 92 in Chester, Montana. This page shows its complete compliance history as reported to the EPA's Safe Drinking Water Information System (SDWIS), the federal database that tracks every public water system in the United States.

What Do These Violations Mean?

Health-based violations mean the system exceeded an EPA maximum contaminant level (MCL) or failed to provide required treatment. These indicate potential health risks from contaminants like lead, arsenic, bacteria, nitrates, or disinfection byproducts. Non-health-based violations involve monitoring, reporting, or procedural requirements — the system missed a testing deadline or failed to notify customers, but contaminant levels were not necessarily unsafe.

What Should You Do?

Your water utility is required to publish an annual Consumer Confidence Report (CCR) that details test results and any violations. If your system has active health-based violations, consider a certified water filter rated for the specific contaminants involved. The contaminant guides on this site explain health risks and filter options for common pollutants. For the most current results, contact your water utility directly — EPA data can lag weeks or months behind real-time testing.