Eleanor Nursing Care Center
On record since 2000: 83 violations. 4 over the limit · 1 treatment lapse · 63 missed or late tests · 15 notices or reports. Most recent began 2025-09-01.
For this year's test results, ask the utility for its annual Consumer Confidence Report. Every community system must publish one.
More violations on record than 96% of active water systems in New York. Small systems with no staff chemist often rack up missed-test violations; big utilities rarely do.
The record, year by year
Across New York, 67% of violations are missed or late tests and 3% are water over a limit.
How far over the limit
Lead & copper at the tap
Utilities sample taps in homes most likely to have lead pipes, and report the 90th-percentile result: 9 in 10 homes sampled came in at or below this number. Above the red line (the action level) the utility must act. The action level is not a safe level; EPA's health goal for lead is zero. EPA's file does not date these results, so they are shown highest first.
Lead, 90th percentile 4 results on file · action level 15 ppb
Every violation on record
- 2025-09-01Consumer Confidence RuleCCR Inadequate ReportingBack in compliance
- 2024-07-01Lead and Copper RuleOCCT/SOWT Study/RecommendationBack in compliance
- 2022-10-012829Monitoring, RegularBack in compliance
- 2022-10-012828Monitoring, RegularBack in compliance
- 2022-10-012827Monitoring, RegularBack in compliance
- 2022-10-012826Monitoring, RegularBack in compliance
- 2022-10-012825Monitoring, RegularBack in compliance
- 2022-10-012824Monitoring, RegularBack in compliance
- 2022-10-012823Monitoring, RegularBack in compliance
- 2022-10-012822Monitoring, RegularBack in compliance
- 2022-10-012821Monitoring, RegularBack in compliance
- 2022-10-012820Monitoring, RegularBack in compliance
- 2022-10-012819Monitoring, RegularBack in compliance
- 2022-10-012816Monitoring, RegularBack in compliance
- 2022-10-012815Monitoring, RegularBack in compliance
- 2022-10-012814Monitoring, RegularBack in compliance
- 2022-10-012813Monitoring, RegularBack in compliance
- 2022-10-012812Monitoring, RegularBack in compliance
- 2022-10-012809Monitoring, RegularBack in compliance
- 2022-10-012808Monitoring, RegularBack in compliance
- 2022-10-012807Monitoring, RegularBack in compliance
- 2022-10-012806Monitoring, RegularBack in compliance
- 2022-10-012805Monitoring, RegularBack in compliance
- 2022-10-012804Monitoring, RegularBack in compliance
- 2022-10-012803Monitoring, RegularBack in compliance
Show the other 58 entries
- 2022-10-012802Monitoring, RegularBack in compliance
- 2022-10-012801Monitoring, RegularBack in compliance
- 2022-10-01ChlorideMonitoring, RegularPeriod ended · no return to compliance on file
- 2022-09-01Consumer Confidence RuleCCR Inadequate ReportingBack in compliance
- 2022-07-012829Monitoring, RegularBack in compliance
- 2022-07-012828Monitoring, RegularBack in compliance
- 2022-07-012827Monitoring, RegularBack in compliance
- 2022-07-012826Monitoring, RegularBack in compliance
- 2022-07-012825Monitoring, RegularBack in compliance
- 2022-07-012824Monitoring, RegularBack in compliance
- 2022-07-012823Monitoring, RegularBack in compliance
- 2022-07-012822Monitoring, RegularBack in compliance
- 2022-07-012821Monitoring, RegularBack in compliance
- 2022-07-012820Monitoring, RegularBack in compliance
- 2022-07-012819Monitoring, RegularBack in compliance
- 2022-07-012816Monitoring, RegularBack in compliance
- 2022-07-012815Monitoring, RegularBack in compliance
- 2022-07-012814Monitoring, RegularBack in compliance
- 2022-07-012813Monitoring, RegularBack in compliance
- 2022-07-012812Monitoring, RegularBack in compliance
- 2022-07-012809Monitoring, RegularBack in compliance
- 2022-07-012808Monitoring, RegularBack in compliance
- 2022-07-012807Monitoring, RegularBack in compliance
- 2022-07-012806Monitoring, RegularBack in compliance
- 2022-07-012805Monitoring, RegularBack in compliance
- 2022-07-012804Monitoring, RegularBack in compliance
- 2022-07-012803Monitoring, RegularBack in compliance
- 2022-07-012802Monitoring, RegularBack in compliance
- 2022-07-012801Monitoring, RegularBack in compliance
- 2022-04-01ChlorideMonitoring, RegularPeriod ended · no return to compliance on file
- 2021-10-012806Monitoring, Check/Repeat/ConfirmationBack in compliance
- 2021-10-012805Monitoring, Check/Repeat/ConfirmationBack in compliance
- 2021-10-011,4-DioxaneMonitoring, Check/Repeat/ConfirmationPeriod ended · no return to compliance on file
- 2021-10-012806Notification, StateBack in compliance
- 2021-10-012805Notification, StateBack in compliance
- 2021-10-011,4-DioxaneNotification, StatePeriod ended · no return to compliance on file
- 2021-04-01Unknown contaminantTreatment TechniquesPeriod ended · no return to compliance on file
- 2021-03-01Unknown contaminantOperations ReportPeriod ended · no return to compliance on file
- 2020-09-01Unknown contaminantOperations ReportBack in compliance
- 2020-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
- 2020-07-01IronMCL, Single Samplemeasured 0.6900 MG/LPeriod ended · no return to compliance on file
- 2020-07-01IronMonitoring, Check/Repeat/ConfirmationPeriod ended · no return to compliance on file
- 2020-04-01IronMCL, Single Samplemeasured 0.9980 MG/LPeriod ended · no return to compliance on file
- 2020-04-01IronMonitoring, Check/Repeat/ConfirmationPeriod ended · no return to compliance on file
- 2020-01-01IronMCL, Single Samplemeasured 0.5950 MG/LPeriod ended · no return to compliance on file
- 2020-01-01IronMonitoring, Check/Repeat/ConfirmationPeriod ended · no return to compliance on file
- 2019-06-01Unknown contaminantOperations ReportBack in compliance
- 2019-01-01IronMCL, Single Samplemeasured 0.5540 MG/L · limit 0.3000 MG/LBack in compliance
- 2018-09-01Consumer Confidence RuleCCR Inadequate ReportingBack in compliance
- 2009-01-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2007-08-21Consumer Confidence RuleCCR Inadequate ReportingBack in compliance
- 2007-06-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2006-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
- 2005-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
- 2005-01-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2004-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
- 2002-01-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2000-01-01NitrateMonitoring, RegularBack in compliance
System details
| Population served | 190 |
| Service connections | 1 |
| Water source | Groundwater |
| System type | Community Water System |
| Owner | Private |
| Status | Active |
| City | Hyde Park |
| EPA ZIP on file | 12538 |
Areas served
- Dutchess County
Reading this record
Eleanor Nursing Care Center is a community water system that draws from groundwater and serves about 190 people in Hyde Park, New York. Everything above comes from the EPA's Safe Drinking Water Information System (SDWIS), where states report every violation by every public water system.
Four kinds of violation. Only one is a measurement of the water: over the limit means a test came back above a legal maximum (an MCL). A treatment lapse means a required protective step was not done, such as disinfection, filtration, fixing a defect an inspector found, or filing a lead-pipe inventory. A missed or late test means a required test was skipped or never reported. That is the most common kind, and the most misread: it does not mean the water was bad, and it does not mean the water was fine. Notices and reports covers public notices and the annual Consumer Confidence Report.
Status. “Back in compliance” means the state recorded a return to compliance. “Period ended” means the violation's compliance period is over but no return to compliance was ever filed, which is common in older records. EPA's federal copy lags state records by months, so call the utility for anything current.