Duval County Crd Concepcion
Open for: Lead service line inventory. EPA counts treatment-technique violations as health-based: a required protective step was not done. It is not a measurement of contamination.
On record since 2004: 75 violations. 36 over the limit · 1 treatment lapse · 16 missed or late tests · 22 notices or reports. Most recent began 2025-07-01.
For this year's test results, ask the utility for its annual Consumer Confidence Report. Every community system must publish one.
More violations on record than 94% of active water systems in Texas. Small systems with no staff chemist often rack up missed-test violations; big utilities rarely do.
The record, year by year
Across Texas, 60% of violations are missed or late tests and 10% are water over a limit.
How far over the limit
Lead & copper at the tap
Utilities sample taps in homes most likely to have lead pipes, and report the 90th-percentile result: 9 in 10 homes sampled came in at or below this number. Above the red line (the action level) the utility must act. The action level is not a safe level; EPA's health goal for lead is zero. EPA's file does not date these results, so they are shown highest first.
Lead, 90th percentile 3 results on file · action level 15 ppb
Open now (3)
- 2025-06-30Public NoticePN Violation for NPDWR ViolationOpen
- 2024-10-17Lead service line inventoryRPTOpen
- 2024-10-17Lead service line inventoryTTOpen
Every violation on record
- 2025-07-01ArsenicMCL, Averagemeasured 0.0110 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2025-06-30Public NoticePN Violation for NPDWR ViolationOpen
- 2025-04-01ArsenicMCL, Averagemeasured 0.0110 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2025-01-01ArsenicMCL, Averagemeasured 0.0110 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2024-10-17Lead service line inventoryRPTOpen
- 2024-10-17Lead service line inventoryTTOpen
- 2024-10-01ArsenicMCL, Averagemeasured 0.0120 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2024-07-01ArsenicMCL, Averagemeasured 0.0130 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2024-04-01ArsenicMCL, Averagemeasured 0.0130 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2024-01-01ArsenicMCL, Averagemeasured 0.0130 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2023-10-01ArsenicMCL, Averagemeasured 0.0150 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2023-07-01ArsenicMCL, Averagemeasured 0.0130 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2023-04-01ArsenicMCL, Averagemeasured 0.0140 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2023-03-07E. ColiMonitoring, Source Water (GWR)Back in compliance
- 2023-01-01ArsenicMCL, Averagemeasured 0.0160 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2022-10-01ArsenicMCL, Averagemeasured 0.0140 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2022-07-01ArsenicMCL, Averagemeasured 0.0150 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2022-04-01ArsenicMCL, Averagemeasured 0.0130 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2022-01-01ArsenicMCL, Averagemeasured 0.0130 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2021-10-01ArsenicMCL, Averagemeasured 0.0120 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2021-07-01ArsenicMCL, Averagemeasured 0.0120 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2021-04-01ArsenicMCL, Averagemeasured 0.0110 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2021-03-15Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2020-10-01ArsenicMCL, Averagemeasured 0.0110 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2020-07-01ArsenicMCL, Averagemeasured 0.0140 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
Show the other 50 entries
- 2020-04-01ArsenicMCL, Averagemeasured 0.0140 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2020-01-01ArsenicMCL, Averagemeasured 0.0170 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2019-10-01ArsenicMCL, Averagemeasured 0.0170 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2019-10-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2019-07-01ArsenicMCL, Averagemeasured 0.0140 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2019-04-01ArsenicMCL, Averagemeasured 0.0150 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2019-01-04Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2019-01-01ArsenicMCL, Averagemeasured 0.0120 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2018-10-26Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2018-07-29Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2018-07-01ArsenicMCL, Averagemeasured 0.0110 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2018-04-01ArsenicMCL, Averagemeasured 0.0110 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2018-01-01ArsenicMCL, Averagemeasured 0.0120 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2018-01-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2017-10-01ArsenicMCL, Averagemeasured 0.0130 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2017-09-29Lead and Copper RuleLead Consumer NoticeBack in compliance
- 2017-09-25Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2017-08-23Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2017-07-01ChlorineMonitoring and Reporting (DBP)Back in compliance
- 2017-07-01ArsenicMCL, Averagemeasured 0.0130 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2017-07-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2017-05-01Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2017-04-01ChlorineMonitoring and Reporting (DBP)Back in compliance
- 2017-04-01ArsenicMCL, Averagemeasured 0.0120 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2017-03-13Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2017-01-16Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2017-01-01ChlorineMonitoring and Reporting (DBP)Back in compliance
- 2017-01-01ArsenicMCL, Averagemeasured 0.0120 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2017-01-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2016-11-15Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2016-11-12Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2016-07-11Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2016-07-01ChlorineMonitoring and Reporting (DBP)Back in compliance
- 2016-07-01ArsenicMCL, Averagemeasured 0.0110 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2016-07-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2016-04-01ChlorineMonitoring and Reporting (DBP)Back in compliance
- 2016-04-01ArsenicMCL, Averagemeasured 0.0130 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2016-02-08Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2016-01-08Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2016-01-01ArsenicMCL, Averagemeasured 0.0140 MG/L · limit 0.0100 MG/LPeriod ended · no return to compliance on file
- 2015-10-01ChlorineMonitoring and Reporting (DBP)Back in compliance
- 2015-10-01Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2015-10-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2015-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
- 2015-04-01ChlorineMonitoring and Reporting (DBP)Back in compliance
- 2015-02-13Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2014-10-01Lead and Copper RuleFollow-up Or Routine LCR Tap M/RBack in compliance
- 2005-07-01Consumer Confidence RuleCCR Complete Failure to ReportBack in compliance
- 2005-03-01Public NoticePN Violation for NPDWR ViolationBack in compliance
- 2004-01-01Consumer Confidence RuleCCR Inadequate ReportingBack in compliance
System details
| Population served | 160 |
| Service connections | 42 |
| Water source | Groundwater |
| System type | Community Water System |
| Owner | Local Government |
| Status | Active |
| City | Benavides |
| EPA ZIP on file | 78341-0469 |
Areas served
- Duval County
Reading this record
Duval County Crd Concepcion is a community water system that draws from groundwater and serves about 160 people in Benavides, Texas. Everything above comes from the EPA's Safe Drinking Water Information System (SDWIS), where states report every violation by every public water system.
Four kinds of violation. Only one is a measurement of the water: over the limit means a test came back above a legal maximum (an MCL). A treatment lapse means a required protective step was not done, such as disinfection, filtration, fixing a defect an inspector found, or filing a lead-pipe inventory. A missed or late test means a required test was skipped or never reported. That is the most common kind, and the most misread: it does not mean the water was bad, and it does not mean the water was fine. Notices and reports covers public notices and the annual Consumer Confidence Report.
Status. “Back in compliance” means the state recorded a return to compliance. “Period ended” means the violation's compliance period is over but no return to compliance was ever filed, which is common in older records. EPA's federal copy lags state records by months, so call the utility for anything current.