Transient Non-Community · PWSID OR4190625

Blm Shotgun Rec Site

Serves 221 peopleGroundwaterOwner: FederalSalem, Oregon
Nothing open that measures the water, but 1 open testing or paperwork violation.

A missed test is not evidence of bad water. It also is not evidence of good water: for that period nobody checked.

On record since 1979: 12 violations. 1 over the limit · 11 missed or late tests. Most recent began 2025-09-15.

For this year's test results, ask the utility for its annual Consumer Confidence Report. Every community system must publish one.

1Over the limit
0Treatment lapse
11Missed or late test1 open
0Notice or report

More violations on record than 63% of active water systems in Oregon. Small systems with no staff chemist often rack up missed-test violations; big utilities rarely do.

The record, year by year

1979 · Missed or late test: 11980 · Missed or late test: 31980 · Missed or late test: 31980 · Missed or late test: 319801983 · Over the limit: 1198519901995200020052010201520202021 · Missed or late test: 12023 · Missed or late test: 12024 · Missed or late test: 22024 · Missed or late test: 22025 · Missed or late test: 32025 · Missed or late test: 32025 · Missed or late test: 32025
One square = one violation, by the year it began. Empty columns are years with nothing on EPA's record.
8% over the limit · 192% missed or late test · 11

Across Oregon, 85% of violations are missed or late tests and 2% are water over a limit.

Open now (1)

  1. 2025-09-15E. ColiMonitoring, Source Water (GWR)Open

Every violation on record

  1. 2025-09-15E. ColiMonitoring, Source Water (GWR)Open
  2. 2025-04-01Revised Total Coliform RuleMONBack in compliance
  3. 2025-03-01Revised Total Coliform RuleMONBack in compliance
  4. 2024-12-01Revised Total Coliform RuleMONPeriod ended · no return to compliance on file
  5. 2024-01-01NitrateMonitoring, RegularPeriod ended · no return to compliance on file
  6. 2023-11-01Revised Total Coliform RuleMONBack in compliance
  7. 2021-01-01ColiphageFailure to Conduct Assessment MonitoringBack in compliance
  8. 1983-01-01Coliform (Pre-TCR)MCL, Averagemeasured 35.00 System inactive
  9. 1980-07-01Coliform (Pre-TCR)Monitoring, RegularSystem inactive
  10. 1980-04-01Coliform (Pre-TCR)Monitoring, RegularSystem inactive
  11. 1980-01-01Coliform (Pre-TCR)Monitoring, RegularSystem inactive
  12. 1979-10-01Coliform (Pre-TCR)Monitoring, RegularSystem inactive

System details

Population served221
Service connections2
Water sourceGroundwater
System typeTransient Non-Community
OwnerFederal
StatusActive
CitySalem
EPA ZIP on file97306

Areas served

  • Lane County

Reading this record

Blm Shotgun Rec Site is a transient non-community that draws from groundwater and serves about 221 people in Salem, Oregon. Everything above comes from the EPA's Safe Drinking Water Information System (SDWIS), where states report every violation by every public water system.

Four kinds of violation. Only one is a measurement of the water: over the limit means a test came back above a legal maximum (an MCL). A treatment lapse means a required protective step was not done, such as disinfection, filtration, fixing a defect an inspector found, or filing a lead-pipe inventory. A missed or late test means a required test was skipped or never reported. That is the most common kind, and the most misread: it does not mean the water was bad, and it does not mean the water was fine. Notices and reports covers public notices and the annual Consumer Confidence Report.

Status. “Back in compliance” means the state recorded a return to compliance. “Period ended” means the violation's compliance period is over but no return to compliance was ever filed, which is common in older records. EPA's federal copy lags state records by months, so call the utility for anything current.